Tom K.

"Right now there's a gap of about four hours between when the last trains of the day leave, usually around midnight, and when the first trains of the day start up, around 4 a.m. on weekdays.

That short window of time without service is used for essential nightly track maintenance. Unlike some public transit systems with multiple sets of tracks on the same routes, BART doesn't have the duplication that would allow us to run trains on one set while performing maintenance on another. Third-rail power has to be shut down for maintenance crews to be able to operate safely and do the work that keeps the system safe and reliable. And the trains can’t run when the power is down."

www.bart.gov/guide/latenight.aspx

Share Link
3
Posted Jun 20, 2013
allison
allison
Jun 20, 2013

Even if it was single track, once an hour, it would be a vast improvement.

Posted by allison on Jun 20, 2013
Sign in or sign up to add a reply.